NEWS
Other matters to be explained for the water and air completion acceptance project of Jiangmen Shenqiang Plastic Machinery Co., Ltd
Release Time:
2019-07-24 09:48
1. Brief description of design, construction and acceptance process of environmental protection facilities
1.1 Design overview
The environmental protection facilities have been included in the design of the construction project. The design of the environmental protection facilities conforms to the environmental protection design specifications. The environmental protection chapter has been prepared, and the measures to prevent pollution and ecological damage and the investment budget of the environmental protection facilities have been implemented.
2 1.2 Construction overview
The environmental protection facilities have been included in the construction contract of the construction project, and the construction progress and funds of the environmental protection facilities have been guaranteed. During the construction of the project, the environmental protection countermeasures proposed in the environmental impact report and the approval decision of the approval department have been organized and implemented.
3 1.3 Brief description of acceptance process
In June 2015, Jiangmen Shenqiang Plastic Machinery Co., Ltd. started the construction of the main works and environmental protection facilities of the project of 250000 sets of auto plastic accessories and 250000 sets of auto door panel interior fittings production and manufacturing technology transformation project, and the project was commissioned and put into operation in September 2017.
In May 2018, Jiangmen Shenqiang Plastic Machinery Co., Ltd. entrusted Guangdong Hengchang Environmental Protection and Energy Saving Testing Technology Co., Ltd. to carry out acceptance monitoring on the project of Jiangmen Shenqiang Plastic Machinery Co., Ltd. to produce 250000 sets of auto plastic parts annually and assemble 250000 sets of auto door panel interior trim.
The acceptance work was started in May 2018, and Guangdong Hengchang Environmental Protection and Energy Saving Testing Technology Co., Ltd. was entrusted to sample, test and prepare the acceptance monitoring report on the project site in June 2018. The preparation of the acceptance monitoring report was completed in June 2018; The enterprise established an acceptance team on June 27, 2018. The acceptance team is composed of the construction units: Xue Xingguo and He Richeng; EIA units: Huang Xueyan, Chen Shenzhong; Environmental protection equipment engineering unit: Mo Zhaojie; Monitoring unit: Li Lijun and Cui Jiequan. The project was accepted. The acceptance team put forward acceptance opinions by means of on-site inspection and data review. The construction project can be put into use after passing the completion acceptance.
4 1.4 Public Feedback and Handling
There is no record of environmental complaints, violations or penalties since the project was established and commissioned.
2 2 Implementation of other environmental protection measures
1 2.1 Implementation of system measures
Environmental Monitoring Plan
The construction unit has formulated the environmental monitoring plan according to the environmental impact report form and the approval decision of the approval department, and entrusted a qualified unit to conduct long-term and irregular monitoring of various pollutants discharged by the project, so as to timely grasp the emission of pollutants.
2.2 Implementation of supporting measures
(1) Regional reduction and elimination of backward production capacity
The construction project does not involve measures to reduce the total amount of pollutants and eliminate backward production capacity in the region.
3 2.3 Implementation of other measures
The construction project does not involve forest land compensation, protection of rare animals and plants, regional environmental improvement, and construction of related peripheral projects, so it does not need to be implemented.
3 3 Rectification
1.1 Design overview
The environmental protection facilities have been included in the design of the construction project. The design of the environmental protection facilities conforms to the environmental protection design specifications. The environmental protection chapter has been prepared, and the measures to prevent pollution and ecological damage and the investment budget of the environmental protection facilities have been implemented.
2 1.2 Construction overview
The environmental protection facilities have been included in the construction contract of the construction project, and the construction progress and funds of the environmental protection facilities have been guaranteed. During the construction of the project, the environmental protection countermeasures proposed in the environmental impact report and the approval decision of the approval department have been organized and implemented.
3 1.3 Brief description of acceptance process
In June 2015, Jiangmen Shenqiang Plastic Machinery Co., Ltd. started the construction of the main works and environmental protection facilities of the project of 250000 sets of auto plastic accessories and 250000 sets of auto door panel interior fittings production and manufacturing technology transformation project, and the project was commissioned and put into operation in September 2017.
In May 2018, Jiangmen Shenqiang Plastic Machinery Co., Ltd. entrusted Guangdong Hengchang Environmental Protection and Energy Saving Testing Technology Co., Ltd. to carry out acceptance monitoring on the project of Jiangmen Shenqiang Plastic Machinery Co., Ltd. to produce 250000 sets of auto plastic parts annually and assemble 250000 sets of auto door panel interior trim.
The acceptance work was started in May 2018, and Guangdong Hengchang Environmental Protection and Energy Saving Testing Technology Co., Ltd. was entrusted to sample, test and prepare the acceptance monitoring report on the project site in June 2018. The preparation of the acceptance monitoring report was completed in June 2018; The enterprise established an acceptance team on June 27, 2018. The acceptance team is composed of the construction units: Xue Xingguo and He Richeng; EIA units: Huang Xueyan, Chen Shenzhong; Environmental protection equipment engineering unit: Mo Zhaojie; Monitoring unit: Li Lijun and Cui Jiequan. The project was accepted. The acceptance team put forward acceptance opinions by means of on-site inspection and data review. The construction project can be put into use after passing the completion acceptance.
4 1.4 Public Feedback and Handling
There is no record of environmental complaints, violations or penalties since the project was established and commissioned.
2 2 Implementation of other environmental protection measures
1 2.1 Implementation of system measures
Environmental Monitoring Plan
The construction unit has formulated the environmental monitoring plan according to the environmental impact report form and the approval decision of the approval department, and entrusted a qualified unit to conduct long-term and irregular monitoring of various pollutants discharged by the project, so as to timely grasp the emission of pollutants.
2.2 Implementation of supporting measures
(1) Regional reduction and elimination of backward production capacity
The construction project does not involve measures to reduce the total amount of pollutants and eliminate backward production capacity in the region.
3 2.3 Implementation of other measures
The construction project does not involve forest land compensation, protection of rare animals and plants, regional environmental improvement, and construction of related peripheral projects, so it does not need to be implemented.
3 3 Rectification


Related News
Jiangmen Shenqiang Plastic Machinery Co., Ltd. is a professional enterprise mainly engaged in the production of auto parts, injection molding parts, complete sets of plastic cover parts and rubber parts for motorcycles, lamps and massagers.
Jiangmen Shenqiang Plastic Machinery Co., Ltd.
Add: No. 195 Jinxing Road, Jiangmen High-tech Industrial Park, Guangdong, China
Tel: +86-750-3866927 (Jiangmen)
Tel: +86-21-39853183 (Shanghai Office)
Fax: +86-750-3868668 (Jiangmen)
Fax: +86-21-39853236 (Shanghai Office)
Email: jm3638223@126.com
E-mail: leekeqiang@hotmail.com
Web:www.jmshenqiang.com